BA Maritime Portfolio
Port Miami, Florida
Cruise Terminal A
Port Miami, Florida
Port Miami, Florida
BA services for Terminal A included construction
administration, construction documentation, design concepts,
and site planning that would determine the location of the
terminal berth, roads, curbside, other transportation features
and parking.
- LEED Silver Certified
- AIA Miami Design Awards 2020 People’s Choice
- Three story, 170,000 square-foot terminal
Cruise Terminal A, PortMiami
BA was commissioned by RCCL as the architect of record for the
new flagship state-of-the-art high-tech Terminal A. Our Team
assisted RCCL and PortMiami in identifying responsibilities
associated with all project development costs. BA services
included construction administration, construction
documentation, design concepts, and site planning that would
determine the location of the terminal berth, roads, curbside,
other transportation features and parking.
Terminal A showcases an angular, glass center and a connected parking garage with 1,000 parking spaces at the northeastern side of the port. The project is certified LEED Gold.
Design and construction administration of regulatory DHS
Customs and Border Protection facilities for the 220,000-SF
flagship terminal facility. Terminal A showcases an angular,
glass center and a connected parking garage with 1,000 parking
spaces at the northeastern side of the port. The project is
certified LEED Gold.
Other Projects
Terminal 10
- Galveston, Texas
Poised to become the globe’s first Net Zero cruise
facility, Terminal 10 at the Port of Galveston is
161,300-square-feet of the most technologically
advanced cruise facility in the world.
See Project
Terminal 3
- Port Canaveral
BA designed and delivered the new 200,000 SF Cruise
Terminal 3 to the Canaveral Port Authority and
Carnival Cruise Lines in 2020 and it was finally used
in August 2021 for their newest ship, Mardi Gras, the
first North American-based LNG powered ship.
See Project
Terminal B
- Port Miami
The project was constructed to LEED Gold standards,
focusing on innovation in design and facility
operation to create a platform that optimizes energy
performance, indoor air quality, water use
efficiencies and maximizes the use of local materials
and human resources.
See Project
Terminal A
- Port Miami
Design and construction administration of regulatory
DHS Customs and Border Protection facilities for the
220,000-SF flagship terminal facility. Terminal A
showcases an angular, glass center and a connected
parking garage with 1,000 parking spaces at the
northeastern side of the port. The project is
certified LEED Gold
See Project
Terminal 25
- Port Everglades
Terminal 25 was designed by BA to complement the
sophistication of the terminal’s new resident ship and
subsequent newbuilds – Celebrity Edge. The facility
features cutting-edge technology, an iconic grand
atrium and interior passenger lounge area design
providing for the ultimate in passenger experience,
while streamlining operations.
See Project
Cruise Terminal & Pier 27
- San Francisco
BA, along with a local design team, developed the
Cruise Ship Terminal and Northeast Wharf Plaza (Public
Park) constructed on an 8-acre pier site comprised of
the existing Pier 27 and the adjacent vehicular
transportation area. The first users of the cruise
ship terminal was the America’s Cup for the sailboat
races on San Francisco Bay.
See Project
Marina Bay Cruise Centre
- Singapore
Marina Bay Cruise Centre was opened in 2012 by the
government of Singapore. BA, in association with RSP
Architects Planners & Engineers (Pte) Ltd. of
Singapore, designed and provided construction
administration of this 320,000-SF, $500-million
multi-story terminal facility and infrastructure to
accommodate a new generation of mega cruise ships.
See Project