Cruise Terminal A
Port Miami, Florida
BA services for Terminal A included construction administration, construction documentation, design concepts, and site planning that would determine the location of the terminal berth, roads, curbside, other transportation features and parking.
  • LEED Silver Certified
  • AIA Miami Design Awards 2020 People’s Choice
  • Three story, 170,000 square-foot terminal

Cruise Terminal A, PortMiami

BA was commissioned by RCCL as the architect of record for the new flagship state-of-the-art high-tech Terminal A. Our Team assisted RCCL and PortMiami in identifying responsibilities associated with all project development costs. BA services included construction administration, construction documentation, design concepts, and site planning that would determine the location of the terminal berth, roads, curbside, other transportation features and parking.
Terminal A showcases an angular, glass center and a connected parking garage with 1,000 parking spaces at the northeastern side of the port. The project is certified LEED Gold.
Design and construction administration of regulatory DHS Customs and Border Protection facilities for the 220,000-SF flagship terminal facility. Terminal A showcases an angular, glass center and a connected parking garage with 1,000 parking spaces at the northeastern side of the port. The project is certified LEED Gold.
Other Projects
Terminal 10
- Galveston, Texas
Poised to become the globe’s first Net Zero cruise facility, Terminal 10 at the Port of Galveston is 161,300-square-feet of the most technologically advanced cruise facility in the world.
See Project
Terminal 3
- Port Canaveral
BA designed and delivered the new 200,000 SF Cruise Terminal 3 to the Canaveral Port Authority and Carnival Cruise Lines in 2020 and it was finally used in August 2021 for their newest ship, Mardi Gras, the first North American-based LNG powered ship.
See Project
Terminal B
- Port Miami
The project was constructed to LEED Gold standards, focusing on innovation in design and facility operation to create a platform that optimizes energy performance, indoor air quality, water use efficiencies and maximizes the use of local materials and human resources.
See Project
Terminal A
- Port Miami
Design and construction administration of regulatory DHS Customs and Border Protection facilities for the 220,000-SF flagship terminal facility. Terminal A showcases an angular, glass center and a connected parking garage with 1,000 parking spaces at the northeastern side of the port. The project is certified LEED Gold
See Project
Terminal 25
- Port Everglades
Terminal 25 was designed by BA to complement the sophistication of the terminal’s new resident ship and subsequent newbuilds – Celebrity Edge. The facility features cutting-edge technology, an iconic grand atrium and interior passenger lounge area design providing for the ultimate in passenger experience, while streamlining operations.
See Project
Cruise Terminal & Pier 27
- San Francisco
BA, along with a local design team, developed the Cruise Ship Terminal and Northeast Wharf Plaza (Public Park) constructed on an 8-acre pier site comprised of the existing Pier 27 and the adjacent vehicular transportation area. The first users of the cruise ship terminal was the America’s Cup for the sailboat races on San Francisco Bay.
See Project
Marina Bay Cruise Centre
- Singapore
Marina Bay Cruise Centre was opened in 2012 by the government of Singapore. BA, in association with RSP Architects Planners & Engineers (Pte) Ltd. of Singapore, designed and provided construction administration of this 320,000-SF, $500-million multi-story terminal facility and infrastructure to accommodate a new generation of mega cruise ships.
See Project